Publications
The ITER ECH & CD Upper Launcher: Steps towards final design of the first confinement system, 2013 IEEE 25th Symposium on Fusion Engineering, SOFE 2013 (2013) 1-6.
,
,
Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR, Fusion Eng. Des. 9-1088 (2013) 2164-2167.
,
,
,
Final design of the generic upper port plug structure for ITER diagnostic systems, Fusion Eng. Des. 102 (2016) 21-27.
,
The internal vacuum transmission lines of the ITER-like ICRH antenna project for JET, Fusion Engineering and Design 66-8 (2003) 657-661.
,
The ITER EC H&CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance, Fusion Eng. Des. 9–1088 (2013) 1929-1933.
,
The ITER EC H&CD upper launcher: Design, analysis and testing of a bolted joint for the Blanket Shield Module, Fusion Eng. Des. 9-1088 (2013) 1881-1885.
,
,
ITER ECH&CD Upper Launcher: Design options and Remote Handling issues of the waveguide assembly, Fus. Eng. Des. 9–1089 (2014) 2415-2418.
,
,
An overview of control system for the ITER electron cyclotron system, Fusion Eng. Des. 6-886 (2011) 959-962.
,
,
,
,
,
,