DIFFER
DIFFER Publication

Where to improve in human-in-the-loop tele-operated maintenance? A phased task analysis based on video data of maintenance at JET

Label Value
Author
Abstract

For the planned teleoperated maintenance of the experimental fusion plant ITER the time performance will be critical. Telemanipulated task execution is however characterised by long execution times compared to similar tasks performed hands-on. There is little quantitative research on task performance of telemanipulated maintenance available to give insight into most effective areas for improvement. In this paper a detailed analysis of real world remote maintenance at fusion plant JET is performed with the aim to: i) identify bottlenecks in task completion time and ii) quantify the room for potential improvement. Video recordings of the installation of 50 tiles executed by the three official master-slave operators were analysed. The task execution was characterised by a large variation in time performance, between but also within operators. Reduction of this variation could theoretically result in time reduction up to 41%. Recurring tasks like ‘rough/fine approach’ and ‘retreat’ covered more than 50% of the total task completion time and were identified as most promising for further improvement. The results will be the base for further research on operator assistance with augmented visual or haptic guidance.

Year of Publication
2018
Journal
Fusion Engineering and Design
Volume
129
Number of Pages
309-319
Date Published
04/2018
URL
DOI
PId
3538707b275e69893f11976800a34255
Alternate Journal
Fusion Eng. Des.
Label
OA
Journal Article
Download citation